John Lee Road Culvert Replacement

A culvert on John Lee Road is aging and in need of replacement.

We plan to replace the failing culvert with a new four-foot diameter corrugated metal pipe. The replacement will ensure continued water flow and prevent damage to the road.

Construction start (expected): September 2024
Construction finish (expected): October 2024

Update

7/11/2024: We are in the process of bidding for a construction contractor.

Funding

Cost: $250,000 (estimate)

Funding source:

​​​Road Fund