The Gaston Road Bridge over Wapato Creek, between Highway 47 and Spring Hill Road, is being replaced with a single-span concrete bridge.

The old timber bridge has reached the end of expected life span and will be replaced before it becomes unusable.

Construction finish (expected): 2/28/21

Update

This project is complete.

Funding

Cost: $1.4 million (2020 estimate)

Funding sources:

House Bill 2017

Prior events and comment opportunities