Posted
For Immediate Release: Thursday, December 01, 2016
An open house for the Timber Road bridge replacement project will be 5-7 p.m. Dec. 15 at Gales Creek Fire Station 52122 NW Old Wilson River Road.
The open house, sponsored by Washington County Department of Land Use & Transportation, provides the public with the opportunity to learn more about the proposed design and the upcoming construction project. No formal presentation is planned; stop in any time during open house hours.
The existing bridge on Timber Road over Gales Creek, north of Hwy 6, is narrow and weight limited. The new single-span concrete bridge will be wider and have shoulders.
Construction is expected to begin in spring. Traffic will be limited to one lane during construction. The $2.06 million project is funded through the County's Major Streets Transportation Improvement Program (MSTIP) Phase 3d.
For more information, visit the project website, or contact Heather Sturgill, communication specialist/PIO, at 503-846-7822 or [email protected]. If you need a sign language interpreter, assistive listening device or a language interpreter, please call 503-846-7800 (or 7-1-1 for Telecommunications Relay Service) at least 48 hours before the event.
Washington County is committed to planning, building and maintaining a great transportation system, ensuring the safety of all roadway users, and operating the County roadway system in a cost-effective and environmentally responsible manner.
Media Contact:
Melissa De Lyser, Communications Coordinator503-846-4963
[email protected]