Documents
Displaying 1 - 10 of 1029
CPO1 March 2023 Thompson and Filbert FINAL.pdf(Link downloads document) (PDF 2.5 MB)
Presentation of the Thompson Road and Filbert Street open houses from the CPO 1 March 2023 meeting.
Presentation
Transportation Improvement Projects
Century Boulevard Extension noise impact study September 2021(Link downloads document) (PDF 2.48 MB)
Noise impact study prepared for the Century Boulevard Extension Project in September 2021.
Transportation Improvement Projects
Personnel Rules and Regulations(Link downloads document) (PDF 874.2 KB)
Effective November 30, 2021.
Policy
County Administrative Office
Witch Hazel Road strip map aerial(Link downloads document) (PDF 8.03 MB)
mapa aéreo de Witch Hazel Road
Publication
Transportation Improvement Projects
Washington County Social Media Policy(Link downloads document) (PDF 145.42 KB)
Policy
County Administrative Office
Workplace Violence - Procedure 503-A(Link downloads document) (PDF 187.64 KB)
Policy
County Administrative Office
Workplace Violence - Policy 503(Link downloads document) (PDF 160.23 KB)
Policy
County Administrative Office
25th Avenue and Cornell Road typical sections for Cornell Road(Link downloads document) (PDF 287.11 KB)
Cornell Road typical sections display as shown at the 25th Avenue and Cornell Road Intersection Project Meet the Contractor Open House.
Presentation
Transportation Improvement Projects
25th Avenue and Cornell Road Intersection typical sections for 25th Avenue(Link downloads document) (PDF 323.96 KB)
25th Avenue typical sections display as shown at the 25th Avenue and Cornell Road Intersection Project Meet the Contractor Open House.
Presentation
Transportation Improvement Projects
25th Avenue and Cornell Road Intersection westbound detour map(Link downloads document) (PDF 1.03 MB)
Westbound detour map as shown at the 25th Avenue and Cornell Road Intersection Project Meet the Contractor Open House.
Presentation
Transportation Improvement Projects